We were responsible for transforming the vacant property south of the new high school into a site that would become the District’s new football stadium. Crews prepared the site by demolishing part of parking lot, dipping sediment out of an old pond, clearing trees along the road right of way, and removing old pipes.
Crews first stripped about 33,000 CY of topsoil that would be re-used at the end of the project. Next they buried over 2,500’ of 18” thru 54” storm sewer. Earthwork consisted of relocating about 20,000 CY of on site material and importing about 90,000 CY from an off-site borrow source.
Two storm basins were constructed complete with concrete channels and concrete discharge structures.